The €100,700 renovation allowance feels plausible until the sequence of work is considered. My main concern is discovering an electrical or water issue after new flooring or bathroom finishes have already gone in.
The property is a 100 m² Helsinki condo priced at €552,000. I am allowing for a kitchen, bathrooms, floors, painting, electrical inspection and modest energy improvements, without adding an extension. Cosmetic items could be deferred if necessary.
Before deciding on a contingency, I want contractors to identify exclusions, material lead times and the exact electrical scope. For example, does an electrical allowance cover only testing, or also remedial work and reinstating opened walls? What else should be verified in the survey, contractor breakdown or condo association records?
The property is a 100 m² Helsinki condo priced at €552,000. I am allowing for a kitchen, bathrooms, floors, painting, electrical inspection and modest energy improvements, without adding an extension. Cosmetic items could be deferred if necessary.
Before deciding on a contingency, I want contractors to identify exclusions, material lead times and the exact electrical scope. For example, does an electrical allowance cover only testing, or also remedial work and reinstating opened walls? What else should be verified in the survey, contractor breakdown or condo association records?