The contractor regards MAD 2,364,000 as a workable preliminary allowance, but I hesitate to attach a contingency percentage before seeing what that total excludes. This is for an 80 m² coastal home in Marrakech, with work expected across the kitchen, bathrooms, floors, decoration, electrics and some energy improvements.
I would rather check the sequence calmly than rush into selecting finishes. The next useful step seems to be a package-by-package breakdown showing labour, materials, provisional sums and exclusions. I also need clarity on whether electrical work means inspection or repairs, who pays to open and restore walls, how moisture and plumbing access will be assessed, and whether permit timing or material lead times could hold up later stages. What would you insist on having in writing before setting the reserve?
I would rather check the sequence calmly than rush into selecting finishes. The next useful step seems to be a package-by-package breakdown showing labour, materials, provisional sums and exclusions. I also need clarity on whether electrical work means inspection or repairs, who pays to open and restore walls, how moisture and plumbing access will be assessed, and whether permit timing or material lead times could hold up later stages. What would you insist on having in writing before setting the reserve?