We learned this the hard way on inspection repairs: a date and a key are not an appointment. Before a tech rolls, we confirm in writing the exact unit and room, what is supposed to be fixed, who can open locked areas, and who can approve a change on the spot — with a phone number that actually gets answered during the visit.
Two things that cut our failed visits most: first, ask the resident (or the office) to clear access to the actual fixture — the panel, the valve, the window — not just the front door. Second, photograph the condition on arrival and the finished work before leaving, so if the scope changes mid-visit there is a record of what was found and what was done. A contractor waiting for a decision is still appointment time, so naming the decision-maker up front saves the second trip.