The general inspector’s position is that a separate sewer check may be unnecessary without slow drainage or smells, and I am hesitant to add every optional test. This is an older 160 m² Hong Kong townhouse, though, and the possibility of tree-root damage makes the decision less straightforward. I have also been quoted HK$93,600 as the potential cost of replacing the line.
My current rule is to order the scope if the relevant private section is accessible and that replacement figure reflects a genuine concern. If it is merely a worst-case estimate with no warning signs, I may keep the money available for moving, the mortgage, the insurance excess and essential furniture. Is that a sensible way to divide the decision?
My current rule is to order the scope if the relevant private section is accessible and that replacement figure reflects a genuine concern. If it is merely a worst-case estimate with no warning signs, I may keep the money available for moving, the mortgage, the insurance excess and essential furniture. Is that a sensible way to divide the decision?