Renovation budget for a 750 sq ft duplex in Los Angeles

yuki_hope

Property investor
Established
I have added permit delays and material lead times to the outline schedule, which raises a new question about how much of the $277,100 budget should remain uncommitted. The project is a 750 sq ft Los Angeles duplex, with work planned to the kitchen, bathrooms, surfaces, electrical systems and energy performance rather than an extension.

Before pricing the contingency, I want the contractor’s scope to state what happens if opening a wall reveals moisture, inaccessible plumbing or electrical work beyond the initial allowance. For example, is investigation and making good included, or does every discovery become a change order?

Would you set one contingency where plumbing and electrical access can be inspected in advance, but a larger one where those areas remain concealed? I would also appreciate suggestions for pre-construction checks that could determine which branch applies, and for separating permit-related schedule risk from actual construction cost.
 
Back
Top