I can either set a generous general reserve now or postpone the finishes until the building systems have been opened up. Neither option feels comfortable: the first could hide a weak scope, while the second makes the programme and final cost uncertain.
The working budget is ₹24,700,000 for a 200 m² Bengaluru warehouse, including a new kitchen and bathrooms, surface work, electrical inspection and some efficiency improvements. There is no proposed extension. Before agreeing the scope, what should be checked around permit timing, moisture, electrical capacity and access to plumbing? I would especially like to know which findings should trigger separate priced allowances rather than being left inside one contingency.
The working budget is ₹24,700,000 for a 200 m² Bengaluru warehouse, including a new kitchen and bathrooms, surface work, electrical inspection and some efficiency improvements. There is no proposed extension. Before agreeing the scope, what should be checked around permit timing, moisture, electrical capacity and access to plumbing? I would especially like to know which findings should trigger separate priced allowances rather than being left inside one contingency.