The finishes are flexible; concealed defects are not. My main concern is committing too much of a ₩624,100,000 renovation allowance before we understand the structure, moisture exposure and building services in this 240 m² small multifamily property in Seoul.
The current plan includes new kitchen and bathroom work, replacement finishes, electrical assessment and some energy improvements, without adding an extension. Cosmetic items could be delayed, whereas unsafe wiring, leaks or structural repairs would have to take priority. How would you set the contingency, and what inspections or bidder questions would uncover exclusions, access costs and material lead times before a contract is signed?
The current plan includes new kitchen and bathroom work, replacement finishes, electrical assessment and some energy improvements, without adding an extension. Cosmetic items could be delayed, whereas unsafe wiring, leaks or structural repairs would have to take priority. How would you set the contingency, and what inspections or bidder questions would uncover exclusions, access costs and material lead times before a contract is signed?