Getting the contingency wrong could leave a 200 m² flat half-finished while access or structural questions are resolved. The preliminary Seoul budget is ₩334,100,000 for a new-build unit, covering the main rooms, surfaces, electrical review and some energy work. An extension is not part of the plan.
My assumption is that a new building should reduce hidden-condition risk, but concealed plumbing without usable access would be an obvious counterexample. The same applies if fixing a service route requires opening work that was priced as purely decorative.
Before choosing a percentage, which drawings, surveys and contractor exclusions should be checked? I would also like to separate genuine contingency from optional upgrades and establish whether any structural work could be triggered by the proposed layout.
My assumption is that a new building should reduce hidden-condition risk, but concealed plumbing without usable access would be an obvious counterexample. The same applies if fixing a service route requires opening work that was priced as purely decorative.
Before choosing a percentage, which drawings, surveys and contractor exclusions should be checked? I would also like to separate genuine contingency from optional upgrades and establish whether any structural work could be triggered by the proposed layout.