If hidden damp or electrical work appears after strip-out, the £45,380 budget and 77-day programme could both fail before the visible finishes even begin.
This is a 750 sq ft detached London house. The planned work covers the kitchen, bathrooms, floors, decoration, electrical assessment and some energy improvements; there is no proposed extension. I want the surveyor to investigate moisture around wet rooms, external walls and roof drainage, while contractors identify likely remedial wiring and all associated making good.
What contingency should remain outside the trade allowances? I would also like to know which materials should be selected early because lead times could dictate the sequence. My priority is resolving work that becomes expensive to reverse, rather than protecting optional finish upgrades.
This is a 750 sq ft detached London house. The planned work covers the kitchen, bathrooms, floors, decoration, electrical assessment and some energy improvements; there is no proposed extension. I want the surveyor to investigate moisture around wet rooms, external walls and roof drainage, while contractors identify likely remedial wiring and all associated making good.
What contingency should remain outside the trade allowances? I would also like to know which materials should be selected early because lead times could dictate the sequence. My priority is resolving work that becomes expensive to reverse, rather than protecting optional finish upgrades.