TaliaBloom
Homeowner
Contractor pricing has to start soon. The choice is whether to define more of the scope first or accept a broader quote and keep a substantial reserve outside the ₹22,270,000 budget for this 230 m² Delhi condo.
The work covers the kitchen, bathrooms, flooring, paint, an electrical inspection and limited efficiency upgrades. There is no extension. The greater risk seems to be what the building’s age may conceal: moisture, inaccessible plumbing or electrical work that only becomes apparent after finishes are removed. Material lead times could then leave trades waiting or force changes to the planned sequence.
Before signing, I want targeted moisture checks, confirmation of plumbing access and an electrical quote that separates testing from remedial work. What else should be investigated before fixing the price, and how would you distinguish genuine contingency from costs that should already be stated in the scope?
The work covers the kitchen, bathrooms, flooring, paint, an electrical inspection and limited efficiency upgrades. There is no extension. The greater risk seems to be what the building’s age may conceal: moisture, inaccessible plumbing or electrical work that only becomes apparent after finishes are removed. Material lead times could then leave trades waiting or force changes to the planned sequence.
Before signing, I want targeted moisture checks, confirmation of plumbing access and an electrical quote that separates testing from remedial work. What else should be investigated before fixing the price, and how would you distinguish genuine contingency from costs that should already be stated in the scope?