I’m 58 days into assessing a renovation of a 2,530 sq ft duplex in Manchester. My preliminary budget is £126,400 for the kitchen, bathrooms, flooring, paint, electrical checks and moderate energy upgrades. No structural extension is planned.
What contingency would people carry, and which survey or contractor questions would expose the biggest unknowns? I’m particularly concerned about sequencing, plumbing access, moisture and vague exclusions rather than finishes. I’d rather simplify the design now than run out of cash halfway through.