If the exclusions are misunderstood, the MX$926,800 figure could stop being useful very quickly. I’m comparing quotes for a 225 m² Mexico City studio, but each contractor has treated preparation, testing and remedial work differently.
The project includes new finishes and work to the kitchen and bathrooms, along with electrical assessment and limited efficiency improvements. An extension is not intended. Decorative selections can still be changed later; plumbing routes, moisture treatment and any structural intervention are much harder to reverse once work begins. Should I hold off setting the contingency until those areas have been inspected, or carry a provisional reserve while requiring every bidder to price the same assumptions?
The project includes new finishes and work to the kitchen and bathrooms, along with electrical assessment and limited efficiency improvements. An extension is not intended. Decorative selections can still be changed later; plumbing routes, moisture treatment and any structural intervention are much harder to reverse once work begins. Should I hold off setting the contingency until those areas have been inspected, or carry a provisional reserve while requiring every bidder to price the same assumptions?