The working assumption is that no structural work is needed, but that is the part I hesitate to trust before opening up a 155 m² country home. I am testing a €285,400 budget covering the kitchen, washrooms, surfaces, decoration, electrical review and some energy improvements.
Plumbing access and hidden moisture seem more capable of derailing the order of work than the chosen finishes. What should I ask the surveyor to verify about service routes, floors and damp sources? I also need to decide how large a separate contingency should be and which quotation exclusions, access costs or long-lead items could consume it.
Plumbing access and hidden moisture seem more capable of derailing the order of work than the chosen finishes. What should I ask the surveyor to verify about service routes, floors and damp sources? I also need to decide how large a separate contingency should be and which quotation exclusions, access costs or long-lead items could consume it.