Renovation budget for a 130 m² apartment in Dubai—thoughts?

GreenSignal

Homeowner
Established
The surprising part was not the gap between the two contractor totals; it was how much each quote left outside the price. That changed my concern from choosing finishes quickly to establishing what work is actually covered.

The working budget is AED 856,600 for a 130 m² apartment in Dubai. The renovation includes a new kitchen and bathrooms, replacement flooring, decoration, electrical inspection and some energy improvements. There is no planned extension, but I do not want either contractor treating unforeseen structural work as an undefined extra.

What should be inspected first to clarify plumbing access, moisture risk, electrical condition and possible building defects? Once those checks are done, I need a realistic contingency and a clear exclusions list. I would also like to tie payments to completed stages rather than dates alone, while allowing for permit delays and long material lead times. How would others sequence this before appointing the contractor?
 
Back
Top