I’ve now allowed DKK 2,590,000 for renovating this 180 m² mixed-use building in Copenhagen, which raises a more basic question: how much of that figure is genuinely priced work and how much is optimism?
The plan covers the kitchen and bathrooms, new floor finishes, decorating, an electrical review and some energy improvements. There is no extension. I’m less worried about choosing expensive finishes than opening a wall and finding damp around old plumbing, or having the electrical scope grow once the installation is inspected.
At this stage, would you spend more on moisture and electrical surveys before tendering, or retain a larger contingency? I also want contractors to identify exclusions and long-lead materials clearly—for example, whether bathroom fittings could hold up the sequence. What would you insist on resolving before signing rather than leaving under contingency?
The plan covers the kitchen and bathrooms, new floor finishes, decorating, an electrical review and some energy improvements. There is no extension. I’m less worried about choosing expensive finishes than opening a wall and finding damp around old plumbing, or having the electrical scope grow once the installation is inspected.
At this stage, would you spend more on moisture and electrical surveys before tendering, or retain a larger contingency? I also want contractors to identify exclusions and long-lead materials clearly—for example, whether bathroom fittings could hold up the sequence. What would you insist on resolving before signing rather than leaving under contingency?