I have checked the headline scope and set a preliminary budget of ₩520,300,000 for this 200 m² small multifamily in Seoul. What remains unclear is how much work sits behind the contractors’ exclusions.
The plan includes new kitchen and bathroom finishes, floors, painting, electrical review and some energy improvements. No extension or deliberate structural alteration is intended, although opening walls could reveal repairs. Each quote handles plumbing access, moisture treatment, permits and reinstatement differently, so comparing totals is not very useful yet.
Would you keep separate allowances for those unknowns or one general reserve? I would also welcome specific questions that expose structural issues, damp risks and long material lead times before the programme is fixed.
The plan includes new kitchen and bathroom finishes, floors, painting, electrical review and some energy improvements. No extension or deliberate structural alteration is intended, although opening walls could reveal repairs. Each quote handles plumbing access, moisture treatment, permits and reinstatement differently, so comparing totals is not very useful yet.
Would you keep separate allowances for those unknowns or one general reserve? I would also welcome specific questions that expose structural issues, damp risks and long material lead times before the programme is fixed.