One view is that KES 7,974,000 should cover a non-structural renovation; the other is that the number means little until the concealed services are investigated. This is a 205 m² detached home in Nairobi, with work planned to the kitchen, bathrooms, floors, decoration, wiring and energy efficiency. I am not proposing an extension.
My concern is what happens once walls or floors are opened. Pipe routes may be difficult to reach, the electrical description is vague, and moisture could turn a straightforward refurbishment into remedial or even structural work. Would you hold a larger contingency until inspections are complete? I’d also appreciate suggestions for questions that force the surveyor and contractors to distinguish investigation, repairs, access, making good and outright exclusions.
My concern is what happens once walls or floors are opened. Pipe routes may be difficult to reach, the electrical description is vague, and moisture could turn a straightforward refurbishment into remedial or even structural work. Would you hold a larger contingency until inspections are complete? I’d also appreciate suggestions for questions that force the surveyor and contractors to distinguish investigation, repairs, access, making good and outright exclusions.