If the estimate is too optimistic, the renovation could stop with the duplex half finished. I have €248,900 set aside for a 230 m², three-bedroom property in Rotterdam, covering new kitchen and bathrooms, floors, decoration, electrical testing and some energy-efficiency work. I am not planning an extension.
Before fixing the design, I want to identify the expensive unknowns. Which surveys would best expose moisture, concealed damage and difficult plumbing routes? I would also like contractors to spell out exclusions, responsibility for opening and restoring walls or floors, and whether permit timing could disrupt the order of work. If moving the kitchen or bathrooms changes the risk substantially, I can keep them near the existing services.
Before fixing the design, I want to identify the expensive unknowns. Which surveys would best expose moisture, concealed damage and difficult plumbing routes? I would also like contractors to spell out exclusions, responsibility for opening and restoring walls or floors, and whether permit timing could disrupt the order of work. If moving the kitchen or bathrooms changes the risk substantially, I can keep them near the existing services.