Hidden moisture is the item making me question the whole allowance, not the visible finishes. The preliminary budget is CLP 364,000,000 for renovating a 235 m², four-bedroom student housing property in Santiago, with no extension or other structural addition.
The proposed work includes the kitchen and bathrooms, new flooring and paint, electrical assessment and some energy improvements. Before fixing a contingency percentage, I want the surveyor or contractor to identify moisture paths, inaccessible plumbing, possible electrical upgrades, material lead times and anything excluded from opening or reinstating walls. Would you reserve separately for concealed defects and later design choices? I am prepared to reduce the finish specification if that keeps essential work properly funded.
The proposed work includes the kitchen and bathrooms, new flooring and paint, electrical assessment and some energy improvements. Before fixing a contingency percentage, I want the surveyor or contractor to identify moisture paths, inaccessible plumbing, possible electrical upgrades, material lead times and anything excluded from opening or reinstating walls. Would you reserve separately for concealed defects and later design choices? I am prepared to reduce the finish specification if that keeps essential work properly funded.