The work needs a reliable sequence before finishes are ordered. Hidden pipework, moisture or permit delays could otherwise undo the budget.
I am testing ₩433,800,000 for renovating a 245 m² detached home in Seoul. The current scope covers the kitchen, bathrooms, flooring, painting, electrical assessment and moderate energy improvements, without a structural extension. What level of contingency would be sensible at this stage? I also want to know which surveys or contractor documents would clarify plumbing access, concealed damp, electrical remedial work and possible structural repairs. Should permit or approval requirements be confirmed before tendering, and how should bidders show allowances and exclusions for conditions that cannot yet be inspected?
I am testing ₩433,800,000 for renovating a 245 m² detached home in Seoul. The current scope covers the kitchen, bathrooms, flooring, painting, electrical assessment and moderate energy improvements, without a structural extension. What level of contingency would be sensible at this stage? I also want to know which surveys or contractor documents would clarify plumbing access, concealed damp, electrical remedial work and possible structural repairs. Should permit or approval requirements be confirmed before tendering, and how should bidders show allowances and exclusions for conditions that cannot yet be inspected?