A second contractor has now priced the job, and the gap between the two quotes raises a more basic question: are they actually allowing for the same work? The project is a 480 sq ft London villa with a working renovation budget of £329,800.
The plan includes replacement kitchen and bathroom elements, new internal finishes, decorating, an electrical inspection and some energy improvements. There is no intended extension, but I do not yet know whether either contractor has assumed structural alterations or remedial work.
Before discussing finish quality, I want both prices broken down by plumbing access, damp treatment, electrical corrections, making good, sequencing, long-lead materials and approval responsibilities. I also need to distinguish true unknowns from items simply left out of a quote.
How would you set the contingency once those differences are reconciled, and which points should a surveyor investigate first? Walking away remains possible, so I’m recording clear proceed, pause and exit conditions rather than increasing the budget merely because time has already been spent.
The plan includes replacement kitchen and bathroom elements, new internal finishes, decorating, an electrical inspection and some energy improvements. There is no intended extension, but I do not yet know whether either contractor has assumed structural alterations or remedial work.
Before discussing finish quality, I want both prices broken down by plumbing access, damp treatment, electrical corrections, making good, sequencing, long-lead materials and approval responsibilities. I also need to distinguish true unknowns from items simply left out of a quote.
How would you set the contingency once those differences are reconciled, and which points should a surveyor investigate first? Walking away remains possible, so I’m recording clear proceed, pause and exit conditions rather than increasing the budget merely because time has already been spent.