$94,100 is the number that has to survive investigation before I can treat this 910 sq ft Boston duplex as viable. The intended work includes updating the kitchen and bathrooms, replacing finishes where needed, checking the electrical system and making some energy improvements. I am not planning an extension.
The finishes can be adjusted later; hidden structural or moisture problems cannot. Before purchase, I want the surveyor or contractor to focus on signs of movement, water entry, plumbing access, the likely extent of electrical work and anything that could alter permitting or the order of works. I also need every contractor exclusion identified, especially where one trade assumes another will open or repair an area.
My staged approach would be to investigate defects that could change the purchase decision now, then leave destructive opening-up and final product choices until access is available. I would carry contingency separately from material allowances and check lead times before fixing the programme. What findings would make you revise the budget, and which would make you abandon the project rather than add contingency?
The finishes can be adjusted later; hidden structural or moisture problems cannot. Before purchase, I want the surveyor or contractor to focus on signs of movement, water entry, plumbing access, the likely extent of electrical work and anything that could alter permitting or the order of works. I also need every contractor exclusion identified, especially where one trade assumes another will open or repair an area.
My staged approach would be to investigate defects that could change the purchase decision now, then leave destructive opening-up and final product choices until access is available. I would carry contingency separately from material allowances and check lead times before fixing the programme. What findings would make you revise the budget, and which would make you abandon the project rather than add contingency?