I need to settle the next rent proposal soon, but pushing from £860 toward the advertised £956 could cost more than it gains. This is student housing in Manchester, and the existing tenant has been dependable and has kept the property in good order.
I’m leaning toward a smaller increase, provided the comparison is genuinely on the same basis and the maintenance history does not point to work that should be dealt with first. I’d like a process I can repeat at each review: check achieved rents where possible, allow for vacancy and changeover costs, inspect outstanding repairs, then discuss the figure with the tenant.
What else should be built into that process? I also need to verify the agreement, the correct local notice route and timing, and whether any change has implications for the way the deposit information is recorded or handled.
I’m leaning toward a smaller increase, provided the comparison is genuinely on the same basis and the maintenance history does not point to work that should be dealt with first. I’d like a process I can repeat at each review: check achieved rents where possible, allow for vacancy and changeover costs, inspect outstanding repairs, then discuss the figure with the tenant.
What else should be built into that process? I also need to verify the agreement, the correct local notice route and timing, and whether any change has implications for the way the deposit information is recorded or handled.