I’m testing a preliminary budget of ARS 266,000,000 to renovate a 180 m², two-bedroom condo in Buenos Aires. Scope is kitchen, bathrooms, flooring, paint, electrical checks and moderate energy upgrades, with no planned structural extension.
My concern is less about finish selection and more about sequencing and concealed conditions. What contingency would you carry, and what should the surveyor or contractor answer about plumbing access, moisture, electrical scope, exclusions, material lead times and permit timing before the figure is treated as reliable?
My concern is less about finish selection and more about sequencing and concealed conditions. What contingency would you carry, and what should the surveyor or contractor answer about plumbing access, moisture, electrical scope, exclusions, material lead times and permit timing before the figure is treated as reliable?