The proposed 55-day programme looks achievable on paper, but I hesitate because the quotes reach similar totals through very different assumptions. The working budget is NZ$61,200 for a 105 m² Auckland townhouse.
The plan includes work to the kitchen and bathrooms, new floor finishes, interior painting, electrical checks and modest energy improvements, without extending the structure. Decorative choices can still be changed later; opening wet areas, choosing plumbing routes or discovering structural work after the contract starts would be much harder to unwind.
Before committing, I want the surveyor or contractors to identify moisture risks, confirm access for services and state what has not been inspected. I also need comparable schedules of allowances, exclusions and material lead times. Would you investigate the uncertain areas first and then set the contingency, or retain a larger reserve until work begins?
The plan includes work to the kitchen and bathrooms, new floor finishes, interior painting, electrical checks and modest energy improvements, without extending the structure. Decorative choices can still be changed later; opening wet areas, choosing plumbing routes or discovering structural work after the contract starts would be much harder to unwind.
Before committing, I want the surveyor or contractors to identify moisture risks, confirm access for services and state what has not been inspected. I also need comparable schedules of allowances, exclusions and material lead times. Would you investigate the uncertain areas first and then set the contingency, or retain a larger reserve until work begins?