I am torn between setting a large contingency now and obtaining tighter contractor scopes before deciding what reserve is justified. After 115 days of reviewing the project, the working budget is SEK 298,800 for an older 140 m² coastal home in Stockholm.
The intended work covers the kitchen and bathrooms, new flooring and paint, checks to the electrics, and some energy-efficiency improvements. There is no extension in the plan. My concern is that hidden moisture, outdated wiring or opening a wall could turn a straightforward sequence into several connected jobs.
Which inspections would you commission before fixing the budget? I also want each contractor to separate labour, materials and lead times, and to list exclusions such as demolition, disposal, drying, electrical remedial work and making good. Those written details seem more useful at this stage than debating finish allowances.
The intended work covers the kitchen and bathrooms, new flooring and paint, checks to the electrics, and some energy-efficiency improvements. There is no extension in the plan. My concern is that hidden moisture, outdated wiring or opening a wall could turn a straightforward sequence into several connected jobs.
Which inspections would you commission before fixing the budget? I also want each contractor to separate labour, materials and lead times, and to list exclusions such as demolition, disposal, drying, electrical remedial work and making good. Those written details seem more useful at this stage than debating finish allowances.