I have checked the visible finishes and set a preliminary budget of ₩281,800,000, but the concealed work remains difficult to judge. The property is a 90 m² studio in Seoul, and the proposed renovation covers the kitchen, bathrooms, floors, decoration, electrical checks and some energy improvements. There is no planned extension or intentional structural alteration.
My priority is identifying work that would be expensive to undo once new surfaces are installed. In particular, how should I investigate plumbing access, moisture and electrical capacity before accepting a contractor total? I would also appreciate views on sizing separate reserves for hidden defects and design changes, and on what evidence would show that structural work is unnecessary rather than merely excluded from the quote.
My priority is identifying work that would be expensive to undo once new surfaces are installed. In particular, how should I investigate plumbing access, moisture and electrical capacity before accepting a contractor total? I would also appreciate views on sizing separate reserves for hidden defects and design changes, and on what evidence would show that structural work is unnecessary rather than merely excluded from the quote.