Shorten the survey window or waive it on a £908,700 London duplex?

jade_details

Property investor
Established
The possible lease-length problem has made me more cautious than the visible condition of the property. We have already lost two older London duplexes to less conditional bidders, but dropping the survey altogether on a £908,700 purchase feels like a risk we could not undo.

I am considering either arranging a survey before the offer deadline or using a short condition limited to serious structural findings. The lease would still need separate legal review, so speed on the survey would not solve everything.

How have others balanced the cost of a pre-offer inspection against the chance of losing the bid? We also need enough cash left after moving and the first mortgage payment to cover urgent repairs rather than discovering that every reserve has gone into the purchase.
 
I would shorten the window rather than waive it. Ask whether the seller will allow a surveyor in before offers are finalised and whether your solicitor can examine the lease information promptly. A survey will not resolve lease length or service-charge questions, so those need separate attention. Is this duplex leasehold, and do you know the remaining term yet?
 
The drawback to a pre-offer survey is paying for it and still losing to another bidder. I would first ask surveyors about turnaround times, then decide whether that cost is acceptable for this particular property. Keep cash aside for the insurance excess and urgent work rather than budgeting every spare pound for furniture. A shorter deadline can look serious without making the condition irrelevant.
 
I’m not convinced a structural-only condition is enough on an older duplex. Damp, roofing, electrics and shared parts of the building may affect costs without fitting neatly into that wording. Equally, a survey is not a guarantee that every defect will be found.

Before changing the offer, get clarity on the lease term, service charges and responsibility for shared repairs. Then price a quick survey and delay nonessential furniture. If the numbers leave no room for immediate repairs, waiving due diligence is solving the bidding problem by creating a cash-flow problem.
 
Back
Top