If the scope is wrong, the MX$2,072,000 figure could distort both the renovation decision and the expected exit date. I am assessing a 105 m², five-bedroom small multifamily property in Mexico City, and two contractors have produced very different prices from what was supposed to be the same brief.
The proposed work covers the kitchen and bathrooms, new floor finishes, redecoration, checks and possible repairs to the electrical system, and limited efficiency improvements. There is no planned extension. My main concern is not choosing finishes; it is discovering moisture, plumbing or wiring problems after work has begun and then losing time by reopening completed areas.
I need to decide whether to investigate first or request matching bids first. For example, identical allowances would still be misleading if one contractor assumes existing wiring can remain and the other includes remedial work. Would targeted moisture tracing, electrical checks and limited opening-up be the sensible first step? After that I could require room-by-room prices showing exclusions, disposal, access, sequencing, permit responsibility and material lead times, with ordinary contingency kept separate from unknown conditions.
The proposed work covers the kitchen and bathrooms, new floor finishes, redecoration, checks and possible repairs to the electrical system, and limited efficiency improvements. There is no planned extension. My main concern is not choosing finishes; it is discovering moisture, plumbing or wiring problems after work has begun and then losing time by reopening completed areas.
I need to decide whether to investigate first or request matching bids first. For example, identical allowances would still be misleading if one contractor assumes existing wiring can remain and the other includes remedial work. Would targeted moisture tracing, electrical checks and limited opening-up be the sensible first step? After that I could require room-by-room prices showing exclusions, disposal, access, sequencing, permit responsibility and material lead times, with ordinary contingency kept separate from unknown conditions.