The quote is cheaper because the preparation is different

RentalNotebook

PropThreads Exclusive
When two contractors quote for the same visible finish, how would you check whether they are pricing the same preparation? The final colour or surface doesn't tell you what happens underneath.
 
Last edited by a moderator:
I would also ask what finding would change the scope. A low quote isn't necessarily poor; it may simply assume a condition that hasn't been verified.
 
Then compare the actual work and exclusions, not just the last line. It is easier to discuss the difference before either contractor starts.
 
Ask each bidder to put the preparation in writing, line by line, in the same format: what gets washed, scraped, sanded, patched and primed; how many finish coats; which rooms and surfaces are included; and what is excluded. When the prep lines match, the totals can be compared fairly — when they do not, the cheaper total usually means less prep, not a better deal.

In occupied units we also ask for the sequence: which rooms first, how dust is contained, and how the crew leaves each room usable at the end of the day. Photographing the walls before work starts helps everyone agree on what was already there. A quote that names the prep is a quote you can hold someone to; one that only names the finish is not.
 
Back
Top