Two repair estimates, one mystery allowance

YieldAndBricks

PropThreads Exclusive
For a deal analysis, suppose both estimates contain a provisional amount for work that hasn't been inspected. Would you use the same allowance in the model, or keep the uncertainty visible until it can be checked?
 
Show a range of plausible outcomes rather than choosing the cheapest assumption simply because it produces a nicer result. The range itself needs evidence, not random percentages.
 
And identify the next action that would narrow it: access, an inspection or a more detailed scope. An uncertainty list is most useful when it also tells you what to do next.
 
From the contractor side, I never let an allowance read as a fixed price. It stays a separate line, with what it covers, what finding could move it, and the range of plausible outcomes — with evidence for the range, not a guessed percentage.

That is also how the two estimates become comparable: same scope, same allowance treatment, then the difference is in the real work, not in who hid the unknown better.

And I agree on the next step: name what would narrow it — access to the area, a closer look, or a more detailed scope — and get that done before signing, not after.

What is the allowance that most often catches people out in your deals — the hidden repair, or the finish choice?
 