Getting the timing wrong could leave us paying the first mortgage instalment and service charges while also funding repairs that should have been caught earlier. We are buying a 4-bed new-build flat in Seoul, and the builder says the municipal approval is sufficient, but I do not see that as a check on every drainage, insulation or finishing issue.
If the contract permits access, is it better to bring in an independent inspector while work can still be corrected, or wait until we have used the flat long enough for hidden faults to emerge? I am leaning toward an early inspection plus a thorough check before the defect-reporting window closes. Which items deserve priority, and how should defects be recorded so the builder cannot dismiss them later?
If the contract permits access, is it better to bring in an independent inspector while work can still be corrected, or wait until we have used the flat long enough for hidden faults to emerge? I am leaning toward an early inspection plus a thorough check before the defect-reporting window closes. Which items deserve priority, and how should defects be recorded so the builder cannot dismiss them later?