I’m torn between holding a large contingency and reducing the specification before requesting firm prices. The first protects the plan from surprises; the second may leave more cash available but could still miss expensive work behind the finishes.
The working budget is PLN 216,900 for a 160 m² serviced apartment in Warsaw. It allows for new kitchen and bathroom work, replacement finishes, decorating, an electrical review and some energy improvements. I am not proposing an extension, though I still need to establish whether any layout changes affect the structure.
Which unknowns would you investigate before choosing the contingency? I’m particularly concerned about access to pipes, damp, the difference between checking the electrics and correcting defects, and costs omitted from the contractor’s scope. I also need a workable sequence for approvals, materials with long lead times and the intended exit date.
My preference is a staged decision: investigate the costly hidden items first, then either retain the design or cut optional finishes before work begins.
The working budget is PLN 216,900 for a 160 m² serviced apartment in Warsaw. It allows for new kitchen and bathroom work, replacement finishes, decorating, an electrical review and some energy improvements. I am not proposing an extension, though I still need to establish whether any layout changes affect the structure.
Which unknowns would you investigate before choosing the contingency? I’m particularly concerned about access to pipes, damp, the difference between checking the electrics and correcting defects, and costs omitted from the contractor’s scope. I also need a workable sequence for approvals, materials with long lead times and the intended exit date.
My preference is a staged decision: investigate the costly hidden items first, then either retain the design or cut optional finishes before work begins.