Our preference is to have the 5-bed detached house independently inspected before completion, but the builder says its required checks make that unnecessary and access may be restricted. The price is £666,900, so relying only on defects being addressed after we move into the Birmingham property feels uncomfortable.
Would a sensible compromise be a detailed inspection as soon as access is permitted, followed by a shorter visit near the end of the defect period? I’m particularly concerned about drainage, insulation and finishing work that may be harder to document later. Separately, we need written confirmation of whether the house is leasehold, the remaining lease term and any charges. We are also allowing for moving costs and checking whether our insurance excess would leave enough cash for early repairs.
Would a sensible compromise be a detailed inspection as soon as access is permitted, followed by a shorter visit near the end of the defect period? I’m particularly concerned about drainage, insulation and finishing work that may be harder to document later. Separately, we need written confirmation of whether the house is leasehold, the remaining lease term and any charges. We are also allowing for moving costs and checking whether our insurance excess would leave enough cash for early repairs.