My preferred outcome is to renovate in stages without letting uncertain building work consume the whole reserve. The obstacle is that opinions on this Rotterdam warehouse are split, and too much of the scope remains based on assumptions.
The purchase price is €1,012,000 and the building is 180 m². I have pencilled in €250,200 for fitting out the kitchen and bathrooms, renewing surfaces, checking the electrical system and making moderate efficiency improvements. I am not proposing an extension, although I realise that does not eliminate the possibility of repairs to the existing structure.
Before proceeding, which investigations would best narrow the exposure from moisture, drainage, electrical capacity and opening floors or walls? I also want contractors to identify exclusions, provisional items and reinstatement work rather than burying them in a single total. I can absorb a contained overrun, but not a scope that remains undefined, so I am setting written conditions for pausing, proceeding or walking away.
The purchase price is €1,012,000 and the building is 180 m². I have pencilled in €250,200 for fitting out the kitchen and bathrooms, renewing surfaces, checking the electrical system and making moderate efficiency improvements. I am not proposing an extension, although I realise that does not eliminate the possibility of repairs to the existing structure.
Before proceeding, which investigations would best narrow the exposure from moisture, drainage, electrical capacity and opening floors or walls? I also want contractors to identify exclusions, provisional items and reinstatement work rather than burying them in a single total. I can absorb a contained overrun, but not a scope that remains undefined, so I am setting written conditions for pausing, proceeding or walking away.