I can either keep the full renovation brief and risk an inadequate reserve, or cut items now without knowing which savings are actually useful. Neither feels sensible before the building has been opened up.
The working budget is $104,600 for a 540 sq ft mixed-use property in Seattle. It covers the kitchen, bathrooms, floors, decorating, electrical review and some energy improvements; there is no planned extension. Concealed plumbing, moisture and any structural work discovered during access are the main worries.
What contingency would you keep separate? I would also appreciate a practical list of what the surveyor should investigate and what each contractor should state as an assumption or exclusion, including sequencing and making good after access.
The working budget is $104,600 for a 540 sq ft mixed-use property in Seattle. It covers the kitchen, bathrooms, floors, decorating, electrical review and some energy improvements; there is no planned extension. Concealed plumbing, moisture and any structural work discovered during access are the main worries.
What contingency would you keep separate? I would also appreciate a practical list of what the surveyor should investigate and what each contractor should state as an assumption or exclusion, including sequencing and making good after access.