No — an invoice alone isn't enough, but the full package doesn't need to be heavy either. I'd ask for four items, scaled to the job:
1. What was agreed, in writing: the problem, the agreed fix, and the date it was meant to be done. That's the reference the invoice has to match — a line that just says "plumbing work" or "repairs" doesn't close anything.
2. Evidence the fix happened as agreed: before and after photos for visible work, and for hidden work, the relevant certificate or a short note from the tradesperson saying what was replaced or repaired. Photos of a finished surface don't prove a pipe behind it was changed.
3. A re-check, not just a claim: the repair tested — water run, door latched, window opened and closed, heating run — and ideally a short independent look if it was a significant issue, as BrickByBrick noted. For a small job, a dated re-test note and photos are proportionate; for structural, electrical or damp work, a specialist sign-off is worth it.
4. What's still open: any follow-up the repairer recommended, with a date, so it doesn't quietly become the buyer's problem after completion.
Agree that list when the repair is agreed, not at exchange. Then closing the question is a checklist tick, not a negotiation — and small jobs stay small.