The 195 m² floor area is the detail that made me question whether €171,500 should be treated as a budget or only as the first stage of one. The Dublin project covers a kitchen, bathrooms, floors, decoration, electrical checks and moderate energy improvements, without an extension in the present scope.
I am considering a staged approach: first pay for surveys, access checks and any permit advice, then seek firm prices once the wiring, plumbing routes and moisture risks are better understood. If those checks are clean, the reserve could remain modest; if walls or floors must be opened, I would want the making-good work and a larger contingency priced separately. What contingency range would members keep outside the working sum, and what exclusions should contractors be required to identify? I also need to clarify how the building’s description as a studio and the position of the wet areas affect the scope.
I am considering a staged approach: first pay for surveys, access checks and any permit advice, then seek firm prices once the wiring, plumbing routes and moisture risks are better understood. If those checks are clean, the reserve could remain modest; if walls or floors must be opened, I would want the making-good work and a larger contingency priced separately. What contingency range would members keep outside the working sum, and what exclusions should contractors be required to identify? I also need to clarify how the building’s description as a studio and the position of the wet areas affect the scope.