The municipal sign-off seems to reassure the builder, but I’m concerned it may not catch defects that matter to us as owners. We are looking at a €979,800 four-bedroom new-build villa in Paris, and I want an independent check of the drainage, insulation and standard of finish.

When would that inspection be most useful: while work is still under way, shortly before we take possession, or later while defects can still be reported? I’m trying to balance the inspection cost against the risk of repairs after moving in. We also need to retain cash for the move, the first mortgage payment, the insurance excess and a genuine emergency reserve.
 
If you can only choose one point, I’d lean toward shortly before handover, once the villa is substantially complete but while defects can still be listed before you settle in. Municipal checks and an inspection for your own benefit are not necessarily looking at the same things.

First ask the builder what access an independent inspector would actually receive and whether utilities will be operating.
 
One addition: don’t treat the final visit as the only opportunity to report problems. Keep dated photos and a written list from the day you receive access. Then monitor drainage, doors, windows and visible finishes after normal use begins, particularly before any contractual defect period ends.
 
I partly disagree on waiting until just before handover. That timing is good for finishes, but it may be too late to assess insulation or anything already covered by walls and floors. If construction is still at a stage where those areas are visible, an earlier visit could be more useful. Julia, do you know what stage the villa has reached and whether the builder allows inspections during construction?
 
The inspection decision also needs to sit inside the moving budget. Leave room for removals, insurance excess, the first mortgage payment and small immediate repairs that may not be worth delaying the move over. Furniture can usually be phased; an emergency fund is harder to rebuild after an expensive completion. I would avoid assuming that “new build” means there will be no first-month costs.
 
Also, is this a completely standalone villa or part of a managed development? If there are shared areas or services, ask what charges begin at handover and what the owner is responsible for. That could change how much cash you preserve, even if the inspection finds very little.
 
This has clarified the decision. I was treating one inspection as if it had to cover both hidden construction issues and the final finish, which may be unrealistic. I’ll ask about access before completion, whether services will be running for the handover visit, and whether any service charges apply. I’m also moving non-essential furniture down the priority list so the emergency fund stays intact.
 
When comparing inspectors, ask what they can and cannot examine at each stage rather than choosing on a vague promise to inspect the whole villa. A useful written report should separate visible defects, items that could not be tested and points needing another look. That makes it easier to send the builder a precise list and avoids assuming that inaccessible insulation was assessed.
 
Two paid visits may be excessive if access is limited or little changes between them. A sensible compromise could be an early inspection only if concealed work is still visible, followed by your own detailed handover walk-through and a diary of issues after moving in. Before relying on any defect-period timing, confirm the dates and reporting process in your French purchase and construction documents with an appropriate local adviser.
 